All pages
Curriculum and ctx
A curriculum moves the training loader between its stages based on what an
evaluation pass just observed. ctx is the plist of run progress that
schedules, optimizers, the objective and the curriculum read.
(defun curriculum (stage ctx observations)
(where (< stage 1)
(where (< (getf observations "eval/loss") 3.3) (+ stage 1) stage)
stage))curriculum
- Receives the current stage as an
i64scalar tensor,ctx, and the observations of the pass that just finished, a plist keyed by metric name as a string. - Returns the new stage: any stage of the training loader, forwards or
backwards, or the current one to stay. Stages are declared with
:stageson the loader; see loaders. With several training loaders every one with stages moves to it, and a loader with one stage stays in it. - It is a graph, so branching is
where, notif. See truth and staging. - Runs after every pass, including those at step 0, never after the last step. Two passes due at one step run it twice, each time on the observations of the pass that just ran.
- Diagnostics are never offered to it; they do not exist on unsampled steps. A
metricin it is not read. - A curriculum with no pass is
E-CONTRACT-014.
A stage change is the annotation stage <old> -> <new>, every metric carries
the stage it was measured in, and curriculum/stage is emitted with every
evaluation. See events.
ctx
A plist of scalar tensors, read with getf:
| key | dtype | meaning |
|---|---|---|
:step | i64 | optimizer steps completed |
:steps | i64 | the run's total, defrun :steps |
:microbatch | i64 | the microbatch index inside the step |
:records | i64 | loader records consumed |
:progress | f32 | :step divided by max(:steps, 1); zero on a fresh zero-step run |
:stage | i64 | the curriculum stage |
:stage-steps | i64 | steps since the stage began |
:stage-records | i64 | records since the stage began |
:<counter> | i64 | one per declared counter, for the whole run |
:stage-<counter> | i64 | the same, since the stage began |
The stage- entries reset to zero whenever the stage changes. A
generator's ctx, and an objective's
written with four parameters, have only the keys that are not counters, since
counters are declared in prepare; a generator's :step gets its trip as its
second argument, not as a ctx key. The values are tensors, so arithmetic on them
builds graph nodes: cast before mixing, (cast (+ (getf ctx :step) 1) :f32).
Related: evaluation passes, schedules.